Bridge at Parish Wood

Scope:

  • Design and build a bridge and dipping platform.

Challenges:  

  • Creating mesh panels from client specification in to a product that was usable and safe for the public.
  • The pond had to be pump-dried to allow pile-driving for the dipping platform on which the bridge was constructed and to allow the safe installation of the platform.
  • Bespoke security bolts for all fixings.